The flow, end to endFrom readings to a work order.
Readings support a maintenance proposal. Reliability reviews the evidence, and operations approves the permit and window. The authorized digital action is to record that order in the CMMS. Physical intervention and return to service remain with operations.
Application scenario for scoping a pilot. Integration with your systems and evidence of each effect are validated with your team.
Scenario to validate
The observed effect is a CMMS record. It does not establish a mechanical repair or permission to restart.
Order: the cell finishes and is destroyed, the witness signs the destruction receipt, and only then does the Gate verify the three signatures (cell, broker, witness), the one-use freshness indicator and that receipt. The next cell exists after that. The notary seals and chains the final receipt.
Illustrative example of how it operates. Measured on bare metal: contract, Gate, signatures, freshness and destruction receipt. The full notary is a prototype; per-cell identity, proven in logic; per-cell memory encryption is to be validated on physical hardware.